Our projects reflect the depth of experience we bring across the utility industry. Whether in distribution, transmission, or specialized scopes, our crews apply proven skill, steady execution, and a strong focus on safety in the field. It’s work built on experience, attention to detail, and getting it done right. Take a look at what we’ve delivered.

CPS Spruce – Pawnee – Tango Live Line Bare Hand 345kV Transmission Line Rebuild

NorthStar successfully installed large-diameter anchor bolt foundations along a live 345 kV transmission line utilizing bare hand construction techniques. With two dedicated foundation crews, the team executed the…

Watermill – Tri Corner – Wilmer 345kV Project

NorthStar mobilized quickly to assume six critical transmission projects for Oncor, overcoming early challenges and aligning resources to meet an accelerated schedule. By leveraging support from multiple Quanta…

VTX1 Fiber Expansion Project

NorthStar Telecom is currently partnering with VTX1 on a transformative 630-mile fiber optic network expansion in Karnes County. This large-scale rural broadband deployment is designed to strengthen network…

Cruce – Del Sol & Cenizo – Cruce (LRGV)

NSES installed several different types of stub angle foundations in diverse soil conditions working alongside NHPL. We have a total of 7 production crews and 2 clean up…

Freebird

Installation of Site Dry Utilities Package. Excavation and Backfill of Duct Banks ( Telecom and Medium Voltage Power ). Setting of all Medium Voltage Equipment (130 Pad Mount…